Essentially, this creates a beveled condition for the frame leaf on the hinge. If our frame is sleeved over a wall that is too thick, the nailing flange spreads which causes the frame to cup at the hinge rabbet. When a Timely frame is sleeved over a wall that is too thick for the frame being used, what is the major problem with hanging the door and why? What is the recommended method for setting a full height frame?īy using a magnetic level on both header and hinge side considering the high side of the floor. Frames installed in fire rated openings must have sufficient screw penetration into the stud.Īdd appropriate dimension to length of screw for additional layers of drywall, furring, sheathing, shear panel or other material What size fasteners are used with the Timely frame for wood studs and for steel studs?įor both wood studs and steel studs use a 1 1/4" bugle head drywall screw. With a screwdriver you eliminate hitting the frame and damaging it. During installation, use of screws makes it easier to adjust the frame pieces. Why do we recommend screws instead of nails for most Timely frame applications?īy using screws, the frame can easily be taken off the wall and relocated. Timely frames can be lead lined by lead shielding companies familiar with the installation of lead on the frame and installation of the frame on the wall. We supply the frames with a peel off coating that protects the finish until the building is ready for occupancy. What do we put over our Brass and Stainless Steel frames? Sidelights and borrowed lights are knocked down, therefore, contractor can finish walls before installing and the frames are much easier to distribute when compared to a welded hollow metal frames. Timely frames are installed after finishing the walls eliminating damage and jobsite call backs.Ĥ. Traditional hollow metal frames must be installed at the beginning of a project and are easily knocked out of alignment requiring difficult frame adjustment.ģ. Considerably less time is required to install a Timely frame since the door and frame are installed as a unit. Primed hollow metal frames require numerous trips to distribute, install and finish the frameĢ. Because door and frame are installed together, only one trip is required to the opening. What are some of the features that make installation of Timely frames much easier than traditional hollow metal frames?ġ. We also recommend that the installer read the installation instruction Sheet(s) packaged in the frame carton or in the Timely Technical Manual. Installation CD’s are available from Timely’s marketing department or the installer can connect to YouTube and enter “Timely Frames” for the same installation videos. How can an installer learn the proper way to install Timely Frames? Once the installer has become familiar with the installation, it should take about 15 minutes to complete the door and frame installation. How long should it take to install a Timely frame? Also, by actually having the door in the opening, the door and frame can be tested to make sure there is no bind or twist and that everything will function properly. This assures that these clearances will be correct for any door of a similar prep. The clearance between the door and a Timely frame is established by adjusting the frame position to fit the door being used. Why do we recommend setting our frame using either a template door or the actual door for the opening?
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |